Full Bathroom Rennovation

I just completed our bathroom renovation.  The bathroom was in very rough shape and was original to the house from 1979.   This project required a full gut job, electrical, plumbing, tile, cabinetry and a lot of finish work.  I found a few surprises along the way including a liquid nailed drain part and a pan on the ceiling below to catch a leaking fitting.

All of the tiled surfaces were done with 12*24 porcelain tile and set on a waterproof red guard membrane.   The tub is a kohler cast iron tub that took six friends to get into place.  I build the vanity to look like a piece of furniture.  The main cabinet is poplar, the drawers are dovetailed maple, the top is solid walnut with a vessel sink.  It was a lot of work but now I don’t think I can wait to redo the master bath.

About penningtonmillworks
I am a pharmaceutical chemist during the day. On evenings and weekends I have a passion for all things home improvement and woodworking. I am always looking for a new challenging project!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: